UCMP's Nicholas Pyenson and Samantha Hopkins return to the mammoth site on September 1, and trench around the block containing the mammoth's ribs. © 2005 UCMP |
Samantha undercuts the block with hand tools, while Nicholas trenches. After their work, only a small pedestal will remain connecting the block to the ground. © 2005 UCMP |
After the top of the block is covered with a layer of wet paper towels, burlap and plaster jacket is applied. © 2005 UCMP |